
Attested C-TS422-1909 Dumps PDF Resource [2021]
Latest C-TS422-1909 Actual Free Exam Questions Updated 91 Questions
SAP C-TS422-1909 Exam Description:
The "SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing" certification exam validates that the candidate possesses the fundamental and core knowledge required of the SAP S/4HANA Manufacturing consultant profile. This certification proves that the candidate has an overall understanding and inādepth technical skills to participate as a member of a project team in a mentored role.
C-TS422-1909 Exam Certification Details:
| Level: | Associate |
| Exam: | 80 questions |
| Sample Questions: | SAP C-TS422-1909 Exam Sample Question |
| Languages: | German, English, French, Chinese |
| Duration: | 180 mins |
| Cut Score: | 55% |
NEW QUESTION 22
What Kanban status automatically posts goods receipt with reference to the procurement element?
Please choose the correct answer.
Response:
- A. Wait
- B. Full
- C. In use
- D. Empty
Answer: B
NEW QUESTION 23
When would you use reporting point backflush in repetitive manufacturing?
There are 2 correct answers to this question.
Response:
- A. When goods issues can wait for final confirmation
- B. For production lines with short lead times
- C. When you need to determine the work in progress
- D. You require an up-to-date inventory for components
Answer: A,C
NEW QUESTION 24
The MRP run detected a shortage of a material that you source from an external supplier in full pallets. How can you make sure you will only receive full pallets?
- A. Use the minimum order quantity.
- B. Use the MRP type for vendor managed inventory.
- C. Use the reorder point.
- D. Use the fixed lot size procedure.
Answer: D
NEW QUESTION 25
How would you define pegging in the context of Advanced Planning?
- A. An evaluation to verify if there are mater al or capacity shortages in the network after the production planning run.
- B. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run.
- C. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements.
- D. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements with receipt elements.
Answer: C
NEW QUESTION 26
How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question.
- A. By material type
- B. By period
- C. By industry
- D. By plant
Answer: B,D
NEW QUESTION 27
You want to schedule an operation finitely, without moving other operations. Which scheduling strategy do you select?
- A. Find Slot
- B. Scheduling working time only
- C. Squeezing
- D. Insert operation
Answer: A
NEW QUESTION 28
What does the bill of material usage (BOM usage) control at the BOM item level?
Response:
- A. Default unit of measure
- B. Default values for the item status
- C. Allowed material type
- D. Maximum allowed low-level code
Answer: C
NEW QUESTION 29
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network? Note: There are
3 correct answers to this question.
- A. SAP Concur
- B. SAP Ariba
- C. SAP Field glass
- D. SAP C/4HANA
- E. SAP SuccessFactors
Answer: A,B,C
NEW QUESTION 30
What are the three transition scenarios for an S/4HANA implementation?
There are 3 correct answers to this question.
Response:
- A. System conversion
- B. Landscape transformation
- C. System upgrade
- D. New implementation
- E. System activation
Answer: A,B,D
NEW QUESTION 31
The settings for MRP can be maintained at different levels. If settings have been maintained in different places, in which sequence does the system search for the MRP settings?
Please choose the correct answer.
Response:
- A. Material Master -> MRP Group -> Plant Settings
- B. Plant Settings -> MRP Group -> Material Master
- C. Material Master -> Plant Settings -> MRP Group
- D. MRP Group -> Material Master -> Plant Settings
Answer: A
NEW QUESTION 32
For a production version to be valid and consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.
- A. The assigned routing must NOT have alternative sequences.
- B. The deletion flag must NOT be set for the bill of materials (BOM) or the routing.
- C. The lot size range must be within the lot-size range of the assigned routing.
- D. The assigned routing must be a rate routing.
- E. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
Answer: B,C,E
NEW QUESTION 33
Which warehouse management functions are available in SAP EWM but NOT in SAP WM?
There are 3 correct answers to this question.
Response:
- A. Expected goods receipt
- B. Handling Unit Management
- C. Yard Management
- D. Labor Management
- E. Slotting
Answer: A,D,E
NEW QUESTION 34
What is the first step in the MRP run?
Please choose the correct answer.
Response:
- A. Net requirements calculation
- B. Lot size calculation
- C. Source determination
- D. BOM explosion
Answer: A
NEW QUESTION 35
What are pillars of SAP Activate?
There are 2 correct answers to this question.
Response:
- A. Premium engagement
- B. SAP Best Practices
- C. SAP MaxAttention
- D. Guided Configuration
Answer: B,D
NEW QUESTION 36
For which data objects do you have to set up CIF integration models in S/4HANA to use them in advanced planning?
There are 2 correct answers to this question.
Response:
- A. Work center
- B. Material master
- C. Contract
- D. Production plant
Answer: C,D
NEW QUESTION 37
Which of these are layers in SAP Best Practice content?
There are 3 correct answers to this question.
Response:
- A. Scope items
- B. Solution packages
- C. Building blocks
- D. Process diagrams
- E. Configuration guides
Answer: A,B,C
NEW QUESTION 38
What are some of the advantages of using Kanban?
There are 2 correct answers to this question.
Response:
- A. It is mostly accomplished by manual postings
- B. Replenishments are based on centralized planning
- C. Replenishments are created close to the actual need
- D. It is a simplified form of production control
Answer: C,D
NEW QUESTION 39
......
SAP C-TS422-1909 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
| Topic 6 |
|
| Topic 7 |
|
| Topic 8 |
|
| Topic 9 |
|
| Topic 10 |
|
C-TS422-1909 Certification Overview Latest C-TS422-1909 PDF Dumps: https://www.ipassleader.com/SAP/C-TS422-1909-practice-exam-dumps.html