NEW QUESTION 33
Which of the following should be included in the work commissioning process? (Multiple Choice)
- A. Must be measured continuously
- B. The commissioning record should be signed by engineers to confirm as soon as possible.
- C. Commissioning record should be recorded at any time
- D. Random sampling test of the project
Answer: A,B,C
NEW QUESTION 34
What are the biggest differences between high-altitude helmets and ground-operated helmets? (Multiple choice)
- A. The weight of the aerial work helmet is relatively light
- B. The aerial work helmet is designed without a hat (or a very small size hat)
- C. Aerial work helmets are designed with vents
Answer: B,C
NEW QUESTION 35
During the installation of the antenna, which of the following links will affect the standing wave? (Multiple choice)
- A. Waterproof is not ready
- B. Jumper damage is not available
- C. The connector is not tightened
- D. Jumper head bilging
Answer: A,C,D
NEW QUESTION 36
What is the correct way to find a snake in the site?
- A. Notification of wildlife protection related organizations
- B. Drive the snake to a distance
- C. Direct batter to death
Answer: A
NEW QUESTION 37
Regarding account password management, which of the following belong to network security violations? (Multiple Choice)
- A. Customer's account and password are authorized by the customer's written authorization
- B. Reserve an undisclosed account in the product or service provided
- C. Attack, destroy customer network, crack customer account password
- D. Leak and spread the account and password of the customer network
Answer: B,C,D
NEW QUESTION 38
When the DBS3900 main equipment BBU is installed in the common cabinet, what is the space between the other equipment?
- A. 4U
- B. 2U
- C. 1U
- D. 3U
Answer: C
NEW QUESTION 39
What are the requirements for construction in hazardous areas? (Multiple choice)
- A. Provide appropriate safety protection for personnel in hazardous area construction, using special safe working tools
- B. In the construction of hazardous areas, emergency measures and safety measures must be taken
- C. Erection of warning signs and enclosure isolation measures
Answer: A,B,C
NEW QUESTION 40
Which of the requirements must be observed by construction workers belonging to special types of work (such as, aerial work, electricians, welders, etc.)?
- A. Only need to pass the prescribed safety technology training assessment, no certificate required
- B. Very experienced, no training and employment permits are required.
- C. Pass the prescribed safety technology training and assessment, and hold the corresponding employment certificate
Answer: C
NEW QUESTION 41
Which of the following operations should be included before a normal cutover, data modification, or upgrade operation? (Multiple Choice)
- A. Equipped with experts for rear support
- B. Develop detailed operational technical solutions
- C. Send back to the company for data inspection
- D. Preparing safe reversal measures
Answer: A,B,C,D
NEW QUESTION 42
After the network cutover is successful and confirms the various business data is normal with the customers, you can leave the room immediately.
- A. False
- B. True
Answer: A
NEW QUESTION 43
Which is the correct statement when you go to the top of the work and hoisting?
- A. You can enter the work at height, hoist the area below, you need to bring PPE
- B. It is forbidden to enter the high position and hoist the lower area.
- C. In the case of safety reminder, on the basis of PPE, you can enter the high position and hoist the lower area.
Answer: B
NEW QUESTION 44
What are both sides in the "high-risk operation" 100% both sides authorization refer?
- A. Huawei company and cooperation unit
- B. Cooperation unit and client unit
- C. On-site supervision and Huawei technical leader
- D. Huawei company and customer units
Answer: D
NEW QUESTION 45
Regarding the description of the laying cable, what is the correct statement below? (Multiple Choice)
- A. Generally, the protective ground wire is yellow-green, and if the cable length is insufficient, it can be cascaded.
- B. The OT terminal should be tightly pressed and the connection should be insulated.
- C. Make sure that there is no crossover when all cables are laid out, and the distance between the signal cable and the power cable is greater than 3cm.
- D. Use the appropriate strength when laying cable, and do not use too much force.
Answer: B,C,D
NEW QUESTION 46
The inspection of the PPE only needs to be carried out at the site and does not need to be checked before departure.
- A. False
- B. True
Answer: A
NEW QUESTION 47
How many RFU modules can up to configure in an RFC cabinet?
- A. 0
- B. 1
- C. 2
- D. 3
Answer: C
NEW QUESTION 48
What is the correct posture of the head needing to keep when carrying heavy loads by hand?
- A. Level
- B. Looking at the ground
- C. Looking at heavy objects
Answer: A
NEW QUESTION 49
......
New (2021) Huawei H35-910-ENU Exam Dumps: https://www.ipassleader.com/Huawei/H35-910-ENU-practice-exam-dumps.html