
Real SAP C_TS413_2021 Exam Questions Study Guide
Updated and Accurate C_TS413_2021 Questions for passing the exam Quickly
SAP C-TS413-2021 exam consists of 80 multiple-choice questions, which candidates must answer within a maximum of 180 minutes. The passing score for the exam is 68%, and it is available in several languages. C_TS413_2021 exam covers a wide range of topics, including asset data management, lifecycle management, depreciation methods, and accounting integration. It also covers topics like technical asset management, preventive maintenance, corrective maintenance, and asset valuation.
NEW QUESTION # 17
Which of the following are components of cloud-based SAP Intelligent Asset Management? Note: There are 2 correct answers tothis question.
- A. SAP Predictive Maintenance and Service
- B. SAP Asset Manager
- C. SAP Work Manager
- D. Worker safety applications
Answer: A,B
NEW QUESTION # 18
The planner adds stock materials in the maintenance order. Which statements regarding reservations in maintenance orders are correct? Note: There are 2 correct answers to this question.
- A. All open reservations are closed when the maintenance order isset to TECO.
- B. Open reservations can be cleared when a maintenance order operation is finally confirmed.
- C. For the combination of order type and planner group you can decide when reservations are created.
- D. Reservations are created only after a material availability checkhas been performed.
Answer: A,B
NEW QUESTION # 19
Which steps support the maintenance technician in the Report andRepair Malfunction Fiori app (3 tiles)? Note: There are 3 correct answers to this question.
- A. Plan repair work for responsible work center.
- B. Complete the malfunction report.
- C. Find malfunction records already created in a list.
- D. Verify planned and actual costs
- E. Assign production resource tool (PRT) to operation.
Answer: A,B,C
NEW QUESTION # 20
You want to create a single cycle plan with a cycle of 12 months. You use the Time - key date scheduling indicator. The orders should be called 3 months before the planned date. How can you setup the maintenance plan? Note: There are 2 correct answers to this question.
- A. Set the call horizon to 25%.
- B. Set the call horizon to 75%.
- C. Set the call horizon to 90 days.
- D. Set the offset to 3 months.
Answer: A,D
NEW QUESTION # 21
The first release of SAP asset manager mobile application is based on
- A. IOS,Android, Windows
- B. ios and android
- C. Windows only
- D. ios only
- E. Android only
Answer: D
NEW QUESTION # 22
Which of the following can you assign to an equipment category via a view profile? Note: There are 2 correct answers to this question.
- A. Manufacturer data
- B. Warranty
- C. Configuration
- D. Serial data
Answer: C,D
NEW QUESTION # 23
During the implementation project you need to define the organizational units relevant for Plant Maintenance. Which of the following objects can you directly assign to a maintenance plant? Note: There are 2 correct answers to this question.
- A. Business partner
- B. Maintenance work center
- C. Maintenance planner group
- D. Storage location
Answer: B,D
NEW QUESTION # 24
What happens if you change the primary key of a functionallocation?
- A. The user must decide whether the functional location is assigned to a new superior functional location.
- B. The functional location is immediately assigned to a new superior functional location when the new label is entered.
- C. Changing the superior functional location via alternative labeling is not possible.
- D. The user must define a new labelling system for the new primary key.
Answer: B
NEW QUESTION # 25
You want to have several plan dates calculated in a maintenance plan. Which scheduling parameter do you use?
- A. Scheduling indicator
- B. Call horizon
- C. Lead float
- D. Scheduling period
Answer: D
NEW QUESTION # 26
You want to assign components to an equipment task list. There isno BOM assigned to the equipment. What is the prerequisite for using the free assignment of material?
- A. Assign the header material of a material BOM to the equipmenttask list header.
- B. Free assignment of material is always possible without any prerequisites.
- C. Assign the BOM usage for free assignment of material in Customizing.
- D. Assign the header material of a material BOM as assembly to atask list operation.
Answer: C
NEW QUESTION # 27
How do you set up the visible tiles for a specific user in SAP Fiori launchpad? Note: There are 2 correct answers to this question.
- A. By assigning a portal role with an SAP Fiori catalog
- B. By assigning a PFCG role with an SAP Fiori catalog
- C. By assigning a PFCG role with an SAP Fiori tile group
- D. By assigning the tiles directly
Answer: B,C
NEW QUESTION # 28
Which activities can the technician perform with the Repair Malfunction SAPUI5 app? Note: There are 2 correct answers to thisquestion.
- A. Complete. Close Report
- B. Put in Process.
Schedule - C. Release. Print
- D. Release. Start Work
Answer: A,D
NEW QUESTION # 29
Which SAP UI technology is used for the technicianls job list?
- A. Web Dynpro
- B. SAP GUI for HTML
- C. SAP GUI for Windows
- D. SAPUI5
Answer: A
NEW QUESTION # 30
You want to see historical information relating to the phases when equipment was installed at a functional location. Where can you find this information?
- A. Location Analysis list
- B. Structure Display
- C. Usage list
- D. Historical Orders list
Answer: C
NEW QUESTION # 31
The technical completion of the current maintenance order was posted with a delay of 5 days. What happens to the next planneddate if you set the shift factor for early completion to 100%?
- A. It is not shifted.
- B. It is postponed by 5 days.
- C. It will be 5 days earlier.
- D. It is postponed by a full cycle (100%).
Answer: B
NEW QUESTION # 32
You need to create a new functional location. Which actions can you perform with the SAP Fiori app Create Technical Object? Note:There are 3 correct answers to this question.
- A. Create a measuring point.
- B. Change a reference location.
- C. Assign a subordinate piece of equipment.
- D. Edit classification data and characteristics.
- E. Assign documents.
Answer: A,D,E
NEW QUESTION # 33
Which of the following BOMs we use to set up spare parts planning of functional locations
- A. Costing BOM
- B. Production BOM
- C. construction BOM
- D. Maintenance BOM
Answer: D
NEW QUESTION # 34
Which of the following is a prerequisite for external refurbishment?
- A. Define the order type for external refurbishment.
- B. Activate the subcontracting indicator in an external activity.
- C. Select the material group for externally refurbished materials.
- D. Create the purchasing info record for the external provider.
Answer: B
NEW QUESTION # 35
Which statements are correct about UI technologies in SAP S/4HANA Asset Management? Note: There are 2 correct answers to this question.
- A. Web Dynpro apps can be used in the SAP Fiori launchpad
- B. The cloud version can also use SAP GUI for Windows.
- C. SAP Fiori launchpad only supports SAP UI5 apps.
- D. SAP GUI transactions can be used in the SAP Fiori launchpad.
Answer: A,C
NEW QUESTION # 36
You want to set up a general maintenance task list for inspectionrounds using the overall time confirmation as a simplified way torecord measurement documents. What do you need to do? Note: There are 2 correct answers to this question.
- A. Assign a piece of equipment with an allocated measuring point to a task list operation.
- B. Assign a measuring point as a production resources/tools(PRT) to a task list operation.
- C. Assign an inspection lot to the task list header.
- D. Assign an inspection document as PRT to the task list operation.
Answer: A,B
NEW QUESTION # 37
What can be determined using the offset within a maintenancestrategy?
- A. The call date for the maintenance order
- B. The cycle duration
- C. The first due date of a maintenance package
- D. The start date of the maintenance order
Answer: C
NEW QUESTION # 38
Which of the following statements about orders with operation account assignment (OAA) are correct? Note: There are 3 correct answers to this question.
- A. The settlement rule is maintained on header level.
- B. Overall costs are dynamically summed up on header level.
- C. A technical object must be assigned to an order operation.
- D. Costs are only stored for the operation object.
- E. Purchase requisitions have the operation as account assignment.
Answer: B,C,D
NEW QUESTION # 39
......
Prepare Important Exam with C_TS413_2021 Exam Dumps: https://www.ipassleader.com/SAP/C_TS413_2021-practice-exam-dumps.html
Download Real C_TS413_2021 Exam Dumps for candidates. 100% Free Dump Files: https://drive.google.com/open?id=1xzGQ2bfNaXmrhVYtRuXdyf7y0LKWNnnT