
Free Sample Questions to Practice C-TS4CO-2023 Certification Test Engine [Oct-2024]
2024 Valid C-TS4CO-2023 Real Exam Questions, practice SAP Certified Associate
SAP C-TS4CO-2023 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
| Topic 6 |
|
| Topic 7 |
|
| Topic 8 |
|
NEW QUESTION # 33
You post a billing document for a sales order with sales order controlling. What data flows to Profit Center Accounting? Note: There are 2 correct answers to this question.
- A. Order quantity
- B. Sales deductions
- C. Payment Discount
- D. Revenues
Answer: B,D
NEW QUESTION # 34
You want to create cost centers for your company. What is the prerequisite to build an organizational structure for overhead cost controlling?
- A. Person responsible
- B. Cost center categories
- C. Standard hierarchy top node
- D. Profit center
Answer: C
NEW QUESTION # 35
How do you maintain number range intervals in Controlling?
- A. By document type
- B. By account type
- C. By business transactions
- D. By cost element category
Answer: C
NEW QUESTION # 36
Which default values can you configure for the product cost collector? Note: There are 2 correct answers to this question.
- A. Result Analysis (RA) Version
- B. Costing variant for preliminary costing
- C. Result Analysis (RA) key
- D. Variance variant
Answer: B,C
NEW QUESTION # 37
Which of the following statements best describe Product Cost by Order? Note: There are 2 correct answers to this question.
- A. It is recommended for products with a long production time.
- B. It is used when controlling by individual production lots or discrete quantities is needed.
- C. It is used when full cost traceability is needed.
- D. It is used when you perform repetitive manufacturing.
Answer: B,C
NEW QUESTION # 38
What do you need to setup in order to bring the values incoming sales orders into account-based Profitability Analysis?
- A. An extension ledger of type "S: Line items with technical numbers / deletion possible"
- B. An extension ledger of type "P: Line items with technical numbers / no deletion possible"
- C. A new standard G/L ledger with exclusive usage for "Prediction"
- D. A multi-valuation ledger
Answer: A
NEW QUESTION # 39
What does SAP/S4HANA select line-item-based data for costing based Profitability Analysis reports?
- A. It select actual data from table CE2XXXX and plan data from CE3XXXX.
- B. It select actual data from table CE1XXXX and plan data from CE2XXXX.
- C. It select actual data from table ACDOCA and plan data from ACDOCP.
- D. It select actual data from table ACDOCA and plan data from COSP.
Answer: B
NEW QUESTION # 40
What are some of the characteristics of planning for internal orders? Note: There are 2 correct answers to this question.
- A. You can enter costs and revenues.
- B. Availability control can check against plan values.
- C. You can define tolerance limits for plan overspend.
- D. You can plan multiple versions.
Answer: A,D
NEW QUESTION # 41
To which object can you settle an internal order using cost elements with cost element category 21 (internal settlement)? Note: There are 3 correct answers to this question.
- A. Asset
- B. Network
- C. General ledger account
- D. Sales order item
- E. WBS element
Answer: B,D,E
NEW QUESTION # 42
How does SAP S/4HANA determine if a characteristic value is valid in Profitability Analysis?
- A. By defining the characteristic value as a value field
- B. By defining the characteristic value in the check table
- C. By defining the characteristic value in the field catalog
- D. By defining the characteristic value as a key figure
Answer: B
NEW QUESTION # 43
How can you populate local variables in Profitability Analysis reports?
- A. By Business Add-In
- B. By user entry during report execution
- C. By user exit
- D. By populating from user parameters
Answer: B
NEW QUESTION # 44
In SAP S/4HANA, you have decided to activate only account-based profitability analysis for your organization. You want to settle costs and revenue of a sales order item to a profitability segment. What do you need to configure?
- A. PA transfer structure
- B. Allocation structure
- C. Cost component structure
- D. Source structure
Answer: A
NEW QUESTION # 45
Which of the following steps are part of the procedure to update the standard price of the material? Note: There are 2 correct answers to this question.
- A. Split the costs.
- B. Release the cost estimate.
- C. Mark the cost estimate.
- D. Archive the cost estimates.
Answer: B,C
NEW QUESTION # 46
Which processes split costs into their primary cost components? Note: There are 2 correct answers to this question.
- A. Execution of the assessment cycles
- B. Settlement of internal orders
- C. Cost center/activity type price calculation
- D. Business process price calculation
Answer: C,D
NEW QUESTION # 47
At what level do you create the structure of the operating concern?
- A. Company code level
- B. Controlling area level
- C. Sales organization level
- D. Client level
Answer: D
NEW QUESTION # 48
What are some of the objectives of Profitability Analysis? Note: There are 2 correct answers to this question.
- A. Allow the company to determine standard costs and revenues according to the period accounting method.
- B. Allow the company to determine if the sales force achieved their contribution margin goals.
- C. Provide the company with information on the performance of its market segments.
- D. Provide the company with a detailed view of its financial statements by areas of responsibilities.
Answer: B,C
NEW QUESTION # 49
You want to setup integrated planning for your internal order. What do you need to do? Note: There are 2 correct answers to this question.
- A. Set the relevant indicator in the controlling area.
- B. Set the relevant indicator in the internal order master record.
- C. Set the relevant indicator in the planning profile of the order type.
- D. Set the relevant indicators in the CO version.
Answer: B,D
NEW QUESTION # 50
You want to run an assessment cycle in Profitability Analysis to allocate cost center costs during period-end closing for your organization. Which of the following objects is part of the assessment cycle?
- A. Cycle iteration
- B. Tracing factor
- C. Template
- D. Sender cost objects
Answer: B
NEW QUESTION # 51
You want to prevent reporting extreme periodic fluctuations in your P&L statement. Which Management Accounting activity should you choose to help spread irregular expenses throughout the fiscal year?
- A. Accrual calculation
- B. Budget availability control
- C. Periodic reporting
- D. Indirect activity allocation
Answer: A
NEW QUESTION # 52
For which of the following situations would you need to implement the transfer price solution in SAP S4/NANA?
- A. Parallel costing is needed in order to calculate separate costs of goods manufactured for different accounting principles.
- B. Parallel price calculation and invoicing are needed to facilitate intercompany reconciliation.
- C. Parallel variation views of the same logistical flows are needed to differentiate between legal and profit center valuation.
- D. Parallel accounting is needed in order to be compliant with different accounting principles.
Answer: C
NEW QUESTION # 53
You want enable WIP calculation in Product Cost by Period. What do you need to configure?
- A. Valuation variant
- B. Profitability Analysis (PA) transfer structure
- C. Variance variant
- D. Settlement profile
Answer: A
NEW QUESTION # 54
......
Genuine C-TS4CO-2023 Exam Dumps Free Demo Valid QA's: https://www.ipassleader.com/SAP/C-TS4CO-2023-practice-exam-dumps.html
Latest Success Metrics For Actual C-TS4CO-2023 Exam (Updated 85 Questions): https://drive.google.com/open?id=1tN9OT6XpBMirB1ig9vB_-QwU5CA6UH8y