NEW QUESTION # 12
Scenario 5: Detika is a private cardiology clinic in Pennsylvania, the US. Detika has one of the most advanced healthcare systems for treating heart diseases. The clinic uses sophisticated apparatus that detects heart diseases in early stages. Since 2010, medical information of Detika's patients is stored on the organization's digital systems. Electronic health records (EHR), among others, include patients' diagnosis, treatment plan, and laboratory results.
Storing and accessing patient and other medical data digitally was a huge and a risky step for Detik a. Considering the sensitivity of information stored in their systems, Detika conducts regular risk assessments to ensure that all information security risks are identified and managed. Last month, Detika conducted a risk assessment which was focused on the EHR system. During risk identification, the IT team found out that some employees were not updating the operating systems regularly. This could cause major problems such as a data breach or loss of software compatibility. In addition, the IT team tested the software and detected a flaw in one of the software modules used. Both issues were reported to the top management and they decided to implement appropriate controls for treating the identified risks. They decided to organize training sessions for all employees in order to make them aware of the importance of the system updates. In addition, the manager of the IT Department was appointed as the person responsible for ensuring that the software is regularly tested.
Another risk identified during the risk assessment was the risk of a potential ransomware attack. This risk was defined as low because all their data was backed up daily. The IT team decided to accept the actual risk of ransomware attacks and concluded that additional measures were not required. This decision was documented in the risk treatment plan and communicated to the risk owner. The risk owner approved the risk treatment plan and documented the risk assessment results.
Following that, Detika initiated the implementation of new controls. In addition, one of the employees of the IT Department was assigned the responsibility for monitoring the implementation process and ensure the effectiveness of the security controls. The IT team, on the other hand, was responsible for allocating the resources needed to effectively implement the new controls.
Based on scenario 5, which risk treatment option did Detika select to treat the risk of a potential ransomware attack?
- A. Risk sharing
- B. Risk retention
- C. Risk avoidance
Answer: B
Explanation:
Risk retention involves accepting the risk when its likelihood or impact is low, or when the cost of mitigating the risk is higher than the benefit. In the scenario, Detika decided to accept the risk of a potential ransomware attack because the data is backed up daily, and additional measures were deemed unnecessary. This decision aligns with the risk retention strategy, where an organization chooses to live with the risk rather than apply further controls. Option A is the correct answer.
Reference:
ISO/IEC 27005:2018, Clause 8.6, "Risk Treatment," which discusses risk retention as an option for managing risks deemed acceptable by the organization.
NEW QUESTION # 13
Scenario 2: Travivve is a travel agency that operates in more than 100 countries. Headquartered in San Francisco, the US, the agency is known for its personalized vacation packages and travel services. Travivve aims to deliver reliable services that meet its clients' needs. Considering the impact of information security in its reputation, Travivve decided to implement an information security management system (ISMS) based on ISO/IEC 27001. In addition, they decided to establish and implement an information security risk management program. Based on the priority of specific departments in Travivve, the top management decided to initially apply the risk management process only in the Sales Management Department. The process would be applicable for other departments only when introducing new technology.
Travivve's top management wanted to make sure that the risk management program is established based on the industry best practices. Therefore, they created a team of three members that would be responsible for establishing and implementing it. One of the team members was Travivve's risk manager who was responsible for supervising the team and planning all risk management activities. In addition, the risk manager was responsible for monitoring the program and reporting the monitoring results to the top management.
Initially, the team decided to analyze the internal and external context of Travivve. As part of the process of understanding the organization and its context, the team identified key processes and activities. Then, the team identified the interested parties and their basic requirements and determined the status of compliance with these requirements. In addition, the team identified all the reference documents that applied to the defined scope of the risk management process, which mainly included the Annex A of ISO/IEC 27001 and the internal security rules established by Travivve. Lastly, the team analyzed both reference documents and justified a few noncompliances with those requirements.
The risk manager selected the information security risk management method which was aligned with other approaches used by the company to manage other risks. The team also communicated the risk management process to all interested parties through previously established communication mechanisms. In addition, they made sure to inform all interested parties about their roles and responsibilities regarding risk management. Travivve also decided to involve interested parties in its risk management activities since, according to the top management, this process required their active participation.
Lastly, Travivve's risk management team decided to conduct the initial information security risk assessment process. As such, the team established the criteria for performing the information security risk assessment which included the consequence criteria and likelihood criteria.
Based on scenario 2, the team decided to involve interested parties in risk management activities. Is this a good practice?
- A. No. only internal interested parties should be involved in risk management activities
- B. No, only the risk management team should be involved in risk management activities
- C. Yes, relevant interested parties should be involved in risk management activities to ensure the successful completion of the risk assessment
Answer: C
Explanation:
According to ISO/IEC 27005, involving relevant interested parties in the risk management process is considered a best practice. This approach ensures that all perspectives are considered, and relevant knowledge is leveraged, which helps in comprehensively identifying, analyzing, and managing risks. Interested parties, such as stakeholders, can provide valuable insights and information regarding the organization's assets, processes, threats, and vulnerabilities, contributing to a more accurate and effective risk assessment. Therefore, option B is correct because it supports the principle that involving relevant parties leads to a more successful risk assessment process. Options A and C are incorrect because excluding either external interested parties or restricting involvement only to the risk management team would limit the effectiveness of the risk management process.
NEW QUESTION # 14
According to ISO 31000, which of the following is a principle of risk management?
- A. Qualitative
- B. Dynamic
- C. Reliability
Answer: B
Explanation:
According to ISO 31000, a principle of risk management is that it should be dynamic. This means that risk management practices should be flexible and able to adapt to changes in the internal and external environment of the organization. Risks are constantly evolving due to changes in technology, regulatory requirements, market conditions, and other factors, and risk management must be capable of responding to these changes. Option A is correct because it aligns with this principle. Option B (Qualitative) refers to a method for assessing risk rather than a principle of risk management, and Option C (Reliability) is not listed as a principle in ISO 31000.
NEW QUESTION # 15
An organization decided to use nonnumerical categories, i.e., low, medium, and high for describing consequence and probability. Which risk analysis methodology is the organization using?
- A. Semi-quantitative
- B. Quantitative
- C. Qualitative
Answer: C
Explanation:
A qualitative risk analysis method uses nonnumerical categories such as low, medium, and high to describe the consequences and probability of risks. This method involves subjective judgment based on expertise, experience, and intuition rather than mathematical calculations. Qualitative methods are often used when it is challenging to obtain accurate numerical data, and they provide a general understanding of risks to prioritize them for further action. Option C is correct because the use of nonnumerical categories aligns with the qualitative risk analysis methodology. Option A (Quantitative) is incorrect as it involves numerical values and statistical methods, while Option B (Semi-quantitative) is a mix of qualitative and quantitative methods, usually involving ranges of numerical values.
NEW QUESTION # 16
Scenario 7: Adstry is a business growth agency that specializes in digital marketing strategies. Adstry helps organizations redefine the relationships with their customers through innovative solutions. Adstry is headquartered in San Francisco and recently opened two new offices in New York. The structure of the company is organized into teams which are led by project managers. The project manager has the full power in any decision related to projects. The team members, on the other hand, report the project's progress to project managers.
Considering that data breaches and ad fraud are common threats in the current business environment, managing risks is essential for Adstry. When planning new projects, each project manager is responsible for ensuring that risks related to a particular project have been identified, assessed, and mitigated. This means that project managers have also the role of the risk manager in Adstry. Taking into account that Adstry heavily relies on technology to complete their projects, their risk assessment certainly involves identification of risks associated with the use of information technology. At the earliest stages of each project, the project manager communicates the risk assessment results to its team members.
Adstry uses a risk management software which helps the project team to detect new potential risks during each phase of the project. This way, team members are informed in a timely manner for the new potential risks and are able to respond to them accordingly. The project managers are responsible for ensuring that the information provided to the team members is communicated using an appropriate language so it can be understood by all of them.
In addition, the project manager may include external interested parties affected by the project in the risk communication. If the project manager decides to include interested parties, the risk communication is thoroughly prepared. The project manager firstly identifies the interested parties that should be informed and takes into account their concerns and possible conflicts that may arise due to risk communication. The risks are communicated to the identified interested parties while taking into consideration the confidentiality of Adstry's information and determining the level of detail that should be included in the risk communication. The project managers use the same risk management software for risk communication with external interested parties since it provides a consistent view of risks. For each project, the project manager arranges regular meetings with relevant interested parties of the project, they discuss the detected risks, their prioritization, and determine appropriate treatment solutions. The information taken from the risk management software and the results of these meetings are documented and are used for decision-making processes. In addition, the company uses a computerized documented information management system for the acquisition, classification, storage, and archiving of its documents.
Based on scenario 7, Adstry's project managers hold regular meetings with interested parties to discuss risks and risk treatment solutions. According to the guidelines of ISO/IEC 27005, is this in compliance with best practices?
- A. No, risk owners should not communicate or discuss risk treatment options with external interested parties
- B. Yes, the coordination between project managers and relevant interested parties can be achieved by discussions upon risks and appropriate treatment solutions
- C. Yes, risks can be communicated to and discussed with relevant interested parties only if the project manager decides that it is appropriate to do so
Answer: B
NEW QUESTION # 17
Scenario 3: Printary is an American company that offers digital printing services. Creating cost-effective and creative products, the company has been part of the printing industry for more than 30 years. Three years ago, the company started to operate online, providing greater flexibility for its clients. Through the website, clients could find information about all services offered by Printary and order personalized products. However, operating online increased the risk of cyber threats, consequently, impacting the business functions of the company. Thus, along with the decision of creating an online business, the company focused on managing information security risks. Their risk management program was established based on ISO/IEC 27005 guidelines and industry best practices.
Last year, the company considered the integration of an online payment system on its website in order to provide more flexibility and transparency to customers. Printary analyzed various available solutions and selected Pay0, a payment processing solution that allows any company to easily collect payments on their website. Before making the decision, Printary conducted a risk assessment to identify and analyze information security risks associated with the software. The risk assessment process involved three phases: identification, analysis, and evaluation. During risk identification, the company inspected assets, threats, and vulnerabilities. In addition, to identify the information security risks, Printary used a list of the identified events that could negatively affect the achievement of information security objectives. The risk identification phase highlighted two main threats associated with the online payment system: error in use and data corruption After conducting a gap analysis, the company concluded that the existing security controls were sufficient to mitigate the threat of data corruption. However, the user interface of the payment solution was complicated, which could increase the risk associated with user errors, and, as a result, impact data integrity and confidentiality.
Subsequently, the risk identification results were analyzed. The company conducted risk analysis in order to understand the nature of the identified risks. They decided to use a quantitative risk analysis methodology because it would provide more detailed information. The selected risk analysis methodology was consistent with the risk evaluation criteri a. Firstly, they used a list of potential incident scenarios to assess their potential impact. In addition, the likelihood of incident scenarios was defined and assessed. Finally, the level of risk was defined as low.
In the end, the level of risk was compared to the risk evaluation and acceptance criteria and was prioritized accordingly.
Based on scenario 3, what does the complicated user interface of the software which could lead to error present?
- A. An asset
- B. A threat
- C. A vulnerability
Answer: C
Explanation:
ISO/IEC 27005 defines a vulnerability as a weakness in an asset or control that could potentially be exploited by one or more threats. In the scenario, the complicated user interface of the payment software represents a weakness that could lead to user errors, potentially impacting data integrity and confidentiality. This aligns with the definition of a vulnerability, as it is a weakness that could be exploited by threats (e.g., errors in use). Therefore, the complicated user interface is correctly identified as a vulnerability, making option A the correct answer.
Reference:
ISO/IEC 27005:2018, Clause 8.3, "Risk Identification," where vulnerabilities are identified as weaknesses that can be exploited by threats.
NEW QUESTION # 18
Scenario 6: Productscape is a market research company headquartered in Brussels, Belgium. It helps organizations understand the needs and expectations of their customers and identify new business opportunities. Productscape's teams have extensive experience in marketing and business strategy and work with some of the best-known organizations in Europe. The industry in which Productscape operates requires effective risk management. Considering that Productscape has access to clients' confidential information, it is responsible for ensuring its security. As such, the company conducts regular risk assessments. The top management appointed Alex as the risk manager, who is responsible for monitoring the risk management process and treating information security risks.
The last risk assessment conducted was focused on information assets. The purpose of this risk assessment was to identify information security risks, understand their level, and take appropriate action to treat them in order to ensure the security of their systems. Alex established a team of three members to perform the risk assessment activities. Each team member was responsible for specific departments included in the risk assessment scope. The risk assessment provided valuable information to identify, understand, and mitigate the risks that Productscape faces.
Initially, the team identified potential risks based on the risk identification results. Prior to analyzing the identified risks, the risk acceptance criteria were established. The criteria for accepting the risks were determined based on Productscape's objectives, operations, and technology. The team created various risk scenarios and determined the likelihood of occurrence as "low," "medium," or "high." They decided that if the likelihood of occurrence for a risk scenario is determined as "low," no further action would be taken. On the other hand, if the likelihood of occurrence for a risk scenario is determined as "high" or "medium," additional controls will be implemented. Some information security risk scenarios defined by Productscape's team were as follows:
1. A cyber attacker exploits a security misconfiguration vulnerability of Productscape's website to launch an attack, which, in turn, could make the website unavailable to users.
2. A cyber attacker gains access to confidential information of clients and may threaten to make the information publicly available unless a ransom is paid.
3. An internal employee clicks on a link embedded in an email that redirects them to an unsecured website, installing a malware on the device.
The likelihood of occurrence for the first risk scenario was determined as "medium." One of the main reasons that such a risk could occur was the usage of default accounts and password. Attackers could exploit this vulnerability and launch a brute-force attack. Therefore, Productscape decided to start using an automated "build and deploy" process which would test the software on deploy and minimize the likelihood of such an incident from happening. However, the team made it clear that the implementation of this process would not eliminate the risk completely and that there was still a low possibility for this risk to occur. Productscape documented the remaining risk and decided to monitor it for changes.
The likelihood of occurrence for the second risk scenario was determined as "medium." Productscape decided to contract an IT company that would provide technical assistance and monitor the company's systems and networks in order to prevent such incidents from happening.
The likelihood of occurrence for the third risk scenario was determined as "high." Thus, Productscape decided to include phishing as a topic on their information security training sessions. In addition, Alex reviewed the controls of Annex A of ISO/IEC 27001 in order to determine the necessary controls for treating this risk. Alex decided to implement control A.8.23 Web filtering which would help the company to reduce the risk of accessing unsecure websites. Although security controls were implemented to treat the risk, the level of the residual risk still did not meet the risk acceptance criteria defined in the beginning of the risk assessment process. Since the cost of implementing additional controls was too high for the company, Productscape decided to accept the residual risk. Therefore, risk owners were assigned the responsibility of managing the residual risk.
Which risk treatment option was used for the second risk scenario? Refer to scenario 6.
- A. Risk retention
- B. Risk sharing
- C. Risk avoidance
Answer: B
Explanation:
Risk sharing, also known as risk transfer, involves sharing the risk with another party, such as through insurance or outsourcing certain activities to third-party vendors. In Scenario 6, Productscape decided to contract an IT company to provide technical assistance and monitor the company's systems and networks to prevent incidents related to the second risk scenario (gaining access to confidential information and threatening to make it public unless a ransom is paid). This is an example of risk sharing because Productscape transferred part of the risk management responsibilities to an external company. Thus, the correct answer is C, Risk sharing.
Reference:
ISO/IEC 27005:2018, Clause 8.6, "Risk Treatment," which includes risk sharing as an option where a third party is used to manage specific risks.
NEW QUESTION # 19
Based on the EBIOS RM method, which of the following is one of the four attack sequence phases?
- A. Attacking
- B. Exploiting
- C. Treating
Answer: B
Explanation:
Based on the EBIOS Risk Manager (EBIOS RM) methodology, the attack sequence phases include various steps that an attacker might take to compromise an organization's assets. The four phases generally cover reconnaissance, exploiting vulnerabilities, achieving objectives, and maintaining persistence. "Exploiting" is specifically the phase where the attacker takes advantage of identified vulnerabilities in the system, which directly aligns with option A.
NEW QUESTION # 20
Scenario 6: Productscape is a market research company headquartered in Brussels, Belgium. It helps organizations understand the needs and expectations of their customers and identify new business opportunities. Productscape's teams have extensive experience in marketing and business strategy and work with some of the best-known organizations in Europe. The industry in which Productscape operates requires effective risk management. Considering that Productscape has access to clients' confidential information, it is responsible for ensuring its security. As such, the company conducts regular risk assessments. The top management appointed Alex as the risk manager, who is responsible for monitoring the risk management process and treating information security risks.
The last risk assessment conducted was focused on information assets. The purpose of this risk assessment was to identify information security risks, understand their level, and take appropriate action to treat them in order to ensure the security of their systems. Alex established a team of three members to perform the risk assessment activities. Each team member was responsible for specific departments included in the risk assessment scope. The risk assessment provided valuable information to identify, understand, and mitigate the risks that Productscape faces.
Initially, the team identified potential risks based on the risk identification results. Prior to analyzing the identified risks, the risk acceptance criteria were established. The criteria for accepting the risks were determined based on Productscape's objectives, operations, and technology. The team created various risk scenarios and determined the likelihood of occurrence as "low," "medium," or "high." They decided that if the likelihood of occurrence for a risk scenario is determined as "low," no further action would be taken. On the other hand, if the likelihood of occurrence for a risk scenario is determined as "high" or "medium," additional controls will be implemented. Some information security risk scenarios defined by Productscape's team were as follows:
1. A cyber attacker exploits a security misconfiguration vulnerability of Productscape's website to launch an attack, which, in turn, could make the website unavailable to users.
2. A cyber attacker gains access to confidential information of clients and may threaten to make the information publicly available unless a ransom is paid.
3. An internal employee clicks on a link embedded in an email that redirects them to an unsecured website, installing a malware on the device.
The likelihood of occurrence for the first risk scenario was determined as "medium." One of the main reasons that such a risk could occur was the usage of default accounts and password. Attackers could exploit this vulnerability and launch a brute-force attack. Therefore, Productscape decided to start using an automated "build and deploy" process which would test the software on deploy and minimize the likelihood of such an incident from happening. However, the team made it clear that the implementation of this process would not eliminate the risk completely and that there was still a low possibility for this risk to occur. Productscape documented the remaining risk and decided to monitor it for changes.
The likelihood of occurrence for the second risk scenario was determined as "medium." Productscape decided to contract an IT company that would provide technical assistance and monitor the company's systems and networks in order to prevent such incidents from happening.
The likelihood of occurrence for the third risk scenario was determined as "high." Thus, Productscape decided to include phishing as a topic on their information security training sessions. In addition, Alex reviewed the controls of Annex A of ISO/IEC 27001 in order to determine the necessary controls for treating this risk. Alex decided to implement control A.8.23 Web filtering which would help the company to reduce the risk of accessing unsecure websites. Although security controls were implemented to treat the risk, the level of the residual risk still did not meet the risk acceptance criteria defined in the beginning of the risk assessment process. Since the cost of implementing additional controls was too high for the company, Productscape decided to accept the residual risk. Therefore, risk owners were assigned the responsibility of managing the residual risk.
Based on scenario 6, Productscape decided to accept the residual risk and risk owners were assigned the responsibility of managing this risk.
Based on the guidelines of ISO/IEC 27005, is this acceptable?
- A. Yes, risk owners must be aware of the residual risk and accept the responsibility for managing it
- B. No, risk approvers are responsible for managing the residual risk after accepting it
- C. No, the top management should manage the residual risk
Answer: A
Explanation:
ISO/IEC 27005 specifies that once a risk treatment has been applied and residual risk remains, it is essential that the risk owner is aware of this residual risk and accepts the responsibility for managing it. The risk owner is the individual or entity accountable for managing specific risks within the organization. In Scenario 6, Productscape decided to accept the residual risk and assigned risk owners the responsibility for managing it, which is fully compliant with ISO/IEC 27005. Thus, the correct answer is A.
Reference:
ISO/IEC 27005:2018, Clause 8.6, "Risk Treatment," which states that risk owners should be aware of and accept responsibility for managing residual risks.
NEW QUESTION # 21
Which statement regarding risks and opportunities is correct?
- A. There is no difference between opportunities and risks; these terms can be used interchangeably
- B. Risks always have a positive outcome whereas opportunities have an unpredicted outcome
- C. Opportunities might have a positive impact, whereas risks might have a negative impact
Answer: C
Explanation:
ISO standards, including ISO/IEC 27005, make a distinction between risks and opportunities. Risks are defined as the effect of uncertainty on objectives, which can result in negative consequences (such as financial loss, reputational damage, or operational disruption). Opportunities, on the other hand, are situations or conditions that have the potential to provide a positive impact on achieving objectives. Therefore, option B is correct, as it accurately reflects that risks are generally associated with negative impacts, while opportunities can lead to positive outcomes. Option A is incorrect because risks can have negative outcomes, not positive ones. Option C is incorrect because risks and opportunities have different meanings and implications and are not interchangeable.
NEW QUESTION # 22
Which statement regarding information gathering techniques is correct?
- A. Sending questionnaires to a group of people who represent the interested parties is NOT preferred
- B. Organizations can utilize technical tools to identify technical vulnerabilities and compile a list of assets that influence risk assessment
- C. Interviews should be conducted only with individuals responsible for information security management
Answer: B
Explanation:
ISO/IEC 27005 supports the use of various information-gathering techniques, including technical tools, to identify and assess risks. Technical tools such as vulnerability scanners and asset management software can help organizations identify technical vulnerabilities and compile a list of assets that are critical for risk assessment. This aligns with the standard's recommendation to use automated tools for an effective risk assessment process. Option B is correct because it accurately describes an effective information-gathering technique.
Reference:
ISO/IEC 27005:2018, Clause 8.2, "Risk Identification," which discusses using tools and techniques to identify risks.
NEW QUESTION # 23
Scenario 7: Adstry is a business growth agency that specializes in digital marketing strategies. Adstry helps organizations redefine the relationships with their customers through innovative solutions. Adstry is headquartered in San Francisco and recently opened two new offices in New York. The structure of the company is organized into teams which are led by project managers. The project manager has the full power in any decision related to projects. The team members, on the other hand, report the project's progress to project managers.
Considering that data breaches and ad fraud are common threats in the current business environment, managing risks is essential for Adstry. When planning new projects, each project manager is responsible for ensuring that risks related to a particular project have been identified, assessed, and mitigated. This means that project managers have also the role of the risk manager in Adstry. Taking into account that Adstry heavily relies on technology to complete their projects, their risk assessment certainly involves identification of risks associated with the use of information technology. At the earliest stages of each project, the project manager communicates the risk assessment results to its team members.
Adstry uses a risk management software which helps the project team to detect new potential risks during each phase of the project. This way, team members are informed in a timely manner for the new potential risks and are able to respond to them accordingly. The project managers are responsible for ensuring that the information provided to the team members is communicated using an appropriate language so it can be understood by all of them.
In addition, the project manager may include external interested parties affected by the project in the risk communication. If the project manager decides to include interested parties, the risk communication is thoroughly prepared. The project manager firstly identifies the interested parties that should be informed and takes into account their concerns and possible conflicts that may arise due to risk communication. The risks are communicated to the identified interested parties while taking into consideration the confidentiality of Adstry's information and determining the level of detail that should be included in the risk communication. The project managers use the same risk management software for risk communication with external interested parties since it provides a consistent view of risks. For each project, the project manager arranges regular meetings with relevant interested parties of the project, they discuss the detected risks, their prioritization, and determine appropriate treatment solutions. The information taken from the risk management software and the results of these meetings are documented and are used for decision-making processes. In addition, the company uses a computerized documented information management system for the acquisition, classification, storage, and archiving of its documents.
Based on the scenario above, answer the following question:
Which of the following documented information management systems does Adstry use?
- A. Electronic documented management system
- B. Cloud-based documented management system
- C. Content management system
Answer: A
Explanation:
Adstry uses a computerized documented information management system for the acquisition, classification, storage, and archiving of documents. This type of system is typically referred to as an Electronic Document Management System (EDMS). An EDMS is designed to handle digital documents and support the management of information, ensuring that documents are stored, retrieved, and maintained efficiently. Option B (Content management system) is incorrect because it primarily manages web content rather than organizational documents. Option C (Cloud-based documented management system) could be partially correct if the EDMS is hosted in the cloud, but the scenario does not specify this.
NEW QUESTION # 24
Which activity below is NOT included in the information security risk assessment process?
- A. Determining the risk identification approach
- B. Selecting information security risk treatment options
- C. Prioritizing risks for risk treatment
Answer: B
Explanation:
The information security risk assessment process, as outlined in ISO/IEC 27005, typically includes identifying risks, assessing their potential impact, and prioritizing them. However, selecting risk treatment options is not part of the risk assessment process itself; it is part of the subsequent risk treatment phase. Therefore, option C is the correct answer as it is not included in the risk assessment process.
NEW QUESTION # 25
After creating a plan for outsourcing to a cloud service provider to store their confidential information in cloud, OrgX decided to not pursue this business strategy since the risk of doing so was high. Which risk treatment option did OrgX use?
- A. Risk sharing
- B. Risk modification
- C. Risk avoidance
Answer: C
Explanation:
OrgX decided not to pursue a business strategy involving outsourcing to a cloud service provider due to the high risk. This decision reflects a "risk avoidance" strategy, where the organization chooses not to engage in an activity that poses unacceptable risks. This aligns with option A.
NEW QUESTION # 26
Scenario 5: Detika is a private cardiology clinic in Pennsylvania, the US. Detika has one of the most advanced healthcare systems for treating heart diseases. The clinic uses sophisticated apparatus that detects heart diseases in early stages. Since 2010, medical information of Detika's patients is stored on the organization's digital systems. Electronic health records (EHR), among others, include patients' diagnosis, treatment plan, and laboratory results.
Storing and accessing patient and other medical data digitally was a huge and a risky step for Detik a. Considering the sensitivity of information stored in their systems, Detika conducts regular risk assessments to ensure that all information security risks are identified and managed. Last month, Detika conducted a risk assessment which was focused on the EHR system. During risk identification, the IT team found out that some employees were not updating the operating systems regularly. This could cause major problems such as a data breach or loss of software compatibility. In addition, the IT team tested the software and detected a flaw in one of the software modules used. Both issues were reported to the top management and they decided to implement appropriate controls for treating the identified risks. They decided to organize training sessions for all employees in order to make them aware of the importance of the system updates. In addition, the manager of the IT Department was appointed as the person responsible for ensuring that the software is regularly tested.
Another risk identified during the risk assessment was the risk of a potential ransomware attack. This risk was defined as low because all their data was backed up daily. The IT team decided to accept the actual risk of ransomware attacks and concluded that additional measures were not required. This decision was documented in the risk treatment plan and communicated to the risk owner. The risk owner approved the risk treatment plan and documented the risk assessment results.
Following that, Detika initiated the implementation of new controls. In addition, one of the employees of the IT Department was assigned the responsibility for monitoring the implementation process and ensure the effectiveness of the security controls. The IT team, on the other hand, was responsible for allocating the resources needed to effectively implement the new controls.
Based on scenario 5, the decision to accept the risk of a potential ransomware attack was approved by the risk owner. Is this acceptable?
- A. No, all interested parties should approve the risk treatment plan
- B. Yes, the risk treatment plan should be approved by the risk owners
- C. No, the risk treatment plan should be approved by the top management and implemented by risk owners
Answer: B
Explanation:
According to ISO/IEC 27005, the risk treatment plan should be approved by the risk owners, who are the individuals or entities responsible for managing specific risks. In the scenario, the risk owner approved the decision to accept the risk of a potential ransomware attack and documented it in the risk treatment plan. This is consistent with the guidelines, which state that risk owners are responsible for deciding on risk treatment and approving the associated plans. Thus, option C is the correct answer.
Reference:
ISO/IEC 27005:2018, Clause 8.6, "Risk Treatment," which emphasizes that risk treatment plans should be approved by the risk owners.